Ontario Place

Client:
Green Infrastructure Partners Inc.

Year:
2024-2025

Location:
Toronto, ON

Project Description:
In support of the Ontario Place redevelopment, site servicing upgrades required the installation of new utilities within a 1.5 km-long trench.

Services:
– Value added engineering and shop drawings to suit contractors means and methods. Design consisted of Sheet Piling and internal bracing.
– Inclinometer & Survey Monitoring

Groundsight Engineers

Projects

GroundSight Engineers - new storm trap (Underground storage tank) was installed as an element of the storm sewer replacement.

Waterdown Storm Trap

As part of the Waterdown road widening project a new storm trap (Underground storage tank) was installed as an element of the storm sewer replacement.