Client:
Green Infrastructure Partners Inc.
Year:
2024
Location:
Waterdown, ON
Project Description:
As part of the Waterdown road widening project a new storm trap (Underground storage tank) was installed as an element of the storm sewer replacement.
Services
– Design of the temporary Support of Excavation (SOE) consisting of cantilevered soldier pile and lagging socketed into shale bedrock
– Field review for the SOE

